Tazawako
Tazawako

Scenic road across the Hachimantai from Iwate Prefecture to Akita Prefecture

Hachimantai Asupite line

八幡平アスピーテライン

Opening is the end of April. About 20 days, both sides of the road is followed by snow corridor. The scenery can be when the snow removal in accordance with the opening, course passing in the snow of the wall that exceeds 6 meters depending on the location is superb view. It can be said that winter left behind "Snow corridor" is a strange landscape winter and early summer intersect.

Detailed Information

Street address
Iwate Prefecture Hachimantai (Iwate Prefecture, Akita Prefecture Towada Hachimantai area)
Street address(Japonais)
岩手県八幡平市(岩手県・秋田県の十和田八幡平地域)
Getting Around

JR Tazawako using Ugo transportation bus "Express Hachimantai line" from the station, get off at Hachimantai summit, a 15-minute walk (about 150 minutes)

Street address Iwate Prefecture Hachimantai (Iwate Prefecture, Akita Prefecture Towada Hachimantai area)
Street address(Japonais) 岩手県八幡平市(岩手県・秋田県の十和田八幡平地域)
Getting Around

JR Tazawako using Ugo transportation bus "Express Hachimantai line" from the station, get off at Hachimantai summit, a 15-minute walk (about 150 minutes)